Section E
Decontamination/Restoration Technician
Foreword
This module combines the criteria from client and management of legal requirements, safety, and hazard and risk assessments. The decontamination protocol is designed by management in module D and this module provides the technician with safe working and quality control procedures.
- 1. Health & safety Legislation
- a. Overview
- b. Specific responsibilities
- c. Necessity
- 2. Overview of CBR agents and effects
- d. Overview of Risk & Hazard associated with CBR agents
- i. Acute effects
- ii. Chronic
- iii.Routes of ingress
- iv. Prophylactic care
- e. PPE Personal Protection Equipment. (Limitations & Use)
- 3) Site Documentation
- a. CDM
- i. Designer
- ii. Planning Supervisor
- iii. Principle Contractor
- b. Central location display (Availability)
- c. Contractor details
- d. Client details
- e. Health & Safety Policy
- f. COSHH Data
- g. Risk & Hazard Assessments
- h. Method statement
- i. Equipment documentation
- j. Personnel Records
- k. Site attendance log (Personnel)
- l. Emergency procedures
- m. Emergency contact details
- n. CDM documentation where applicable
- o. Government or HSE special instructions/Notification
- p. Details of nearest Medical assistance
- q. Site safety officer & route to contact
- r. Name & contact details of site first aid
Site medical cabinet (location) keys
- 4) Site Visitors
- a. Appointment Requirements
- b. Authorising authorities
- c. Competence & Certification
- d. PPE & Suitability
- e. Insurance & liability issues
- f. Tool box talk
- g. Escort rules
- h. Waiver (legal)
- 5) Employee Safety
- a. Selection of employees
- i. Physical fitness and suitability
- ii. Medicals
- iii. Psychological testing
- b. Team selection & leadership skills
- c. Heat stress
- d. Dehydration
- e. Working parameters
- i. Live stress testing in PPE
- ii. Production rate in and out of PPE
- iii. Breaks and procedures
- f. Confined Space & Isolated work
- g. Legal obligations
- h. Safety & common sense
- i. Accident or Emergency
- j. Notification
- k. Confined space working procedures
- l. Buddy Buddy systems
- i. 123 Rule
- ii. Extraction procedures
- 6) Daily employee Inspection/medical
- a. Procedure
- b.Notification
- 7) Types of PPE explained
- a. Level A GTCPS (gas tight chemical protection suite)
- i. SCBA types safety, working limitations
- ii. Heat stress
- iii. Re-Breathers
- iv. Cooling procedures and equipment
- v. Supply air and filtration
- vi. Level B
- vii. Level C
- viii.Level D
- b. Respirators Types
- i. Full face
- ii. Powered (PAPR)
- iii. Piggy
- iv. Disposable
- v. Filter types
- vi. Protection factors
- f. Use & Maintenance
- i. Fit Testing
- ii. Cleaning
- iii. Inspection procedures
- iv. Self
- v. Supervisor
- vi. Manufacturers agent
- vii. Maintenance
- 8) Initial Works protocol
- a) Install decontamination procedures
- b) Make safe
- c) Establish emergency controls
- d) Undertake Triage procedures
- 9) Records Storage & Use of PPE
- a. Face Fit Testing
- b. Filter type
- i. Inspection
- ii. Loading
- iii. Change regime
- c. PAPR
- i. Battery charging
- ii. Flow rates
- d. Cleaning
- i. Decontamination procedures
- e. Storage
- i. Daily Inspection
- ii. Training
- f. Weekly inspection
- g. Training
- h. Monthly inspection
- i. Training
- i. Records
- j. Accountability
- 10) Re Breathers Specific
- a. Decontaminating units end of shift
- b.Ice
- c. Cooling jackets
- 11)Type of Suit
- a. Cleaning or disposal procedures
- b. Colours used and code
- c. Material specification
- d. Type protection factor(specification)
- 12) Types of Glove
- a. ID
- b. Gauntlet
- c. Glove
- i. Type
- ii. Material
- iii. Sizes
- d. Safety procedures
- e. Under gloves
- f. Latex issues
- 13) Boots
- a. ID
- b. Colour
- c. Type
- g. Material
- h. Overshoes
- i. Transit procedures
- 14) Fitting & use of PPE
- a.Size & fit
- b. Inspection
- c. Cleaning & maintenance
- d. Use of tape
- i. Acceptable benefits
- ii. Shortfalls
- 15) Personnel Site Decontamination Procedure
- a. Site of Decontamination Unit
- b. Travelling to decontamination unit
- c. Route In – Out
- d. Construction parameters
- i. Storage
- ii. Charging facilities
- iii. Pressure differentials
- iv. Testing & certification
- v. Heating & water temperature
- vi. Self assessments (injury)
- vii. Don & Doffing procedures
- viii. Soap & towels
- ix. Underwear
- x. Cooling jackets
- xi. Waste Collection
- 16) Site Decontamination Unit
- a. Description
- i. 3 stage air lock
- b. Procedures
- 17) Emergencies
- a. Accidental Exposure
- b. Emergency procedures
- c. Emergency Evacuation
- d. Pear Shape Procedures
- i. Notification
- ii. Support
- 18) Technician Physical Condition
- a. Physical fitness
- b. Medical
- c. Respiratory assessments
- d. Fat & Fitness
- e. Prophylactic care certification
- f. Visual inspection cuts grazes, flu symptoms
- g.Inoculations
- 19) Daily employee Inspection/medical
- a. Procedure
- b. Notification
- 20) Working Conditions
- a. Times & Breaks
- b. Decontamination
- i. Heat stress
- ii. Cold stress
- iii. Dehydration &fluid intake
- iv.Warning Signs
- 21) Confined Space & Isolated work
- a. Legal obligations
- b. Safety & common sense
- c. Accident or Emergency Notification
- d. Confined space working procedures
- e. Buddy Buddy systems
- i. 123 Rule
- ii. Extraction procedures
- 22) Maximising Tools and equipment
- a. Use of approach angles
- b. Distance and Radii failures
- c. Pressure & flow rates
- d. Dwell periods
- e. Significance of QC
- 23) Standard of works
- a. Clear objectives
- b. Written instructions
- c. Site induction
- d. Procedure training
- 24) Quality Of Work
- a. Importance of Quality work
- i. Public confidence
- ii. Economy & Economics
- iii. Safety
- b. Falsifying Records & Camouflage
- i. Personal liabilities
- ii. Public liabilities
- 25) Quality Control Protocols
- a. Typical applications and necessity
- i. Examples of failure
- ii. List benefits
- iii. Domino effect (explanation)
- b. Identification of Q/C parameters
- i. Importance
- ii. Significance
- c. Measurement techniques
- d. Accountability
- e. Monitoring and compilation
- f. Record keeping
- g. Audit records
- h. Proof
- 26) Improvements & Suggestions
- a. Procedures
- b. Joint Benefits
- c. Management route
- d. Acceptance notification
- 27) Building Enclosures
- a. Air Locks
- b. 3 stage units
- c. Enclosures
- d. Material use
- i. Polythene
- ii. Board
- iii. Shrink wrap
- iv. Glue
- v. Tape
- vi. Telescopic tools
- vii. Framework Generally
- viii. Testing Integrity
- e. Fire Risk
- f. Fire precautions
- 28) Negative Pressure
- a. Calculating requirements
- b. Measurement
- c. Safety controls
- d. Recording data
- e. Equipment requirements
- f. Roving heads
- g. Exhaust
- h. Filter specification
- i. Changing filters & safety issues
- j. Emergency procedures
- 29) Improvements & Suggestions
- a. Procedures
- b. Joint Benefits
- c. Management route
- d. Acceptance notification
- 30) 24 Hour (Continuous Working)
- a. Quality control problems
- i. Improving procedure
- ii. Accountability failures
- iii. Recommendations
- b. Shift change requirements
- i. Transferring information
- ii. Overlap requirement
- iii. Managing information
- iv. Accountability
- 31) Records & Audit
- a. Template forms
- b. Management systems
- c. Procedures
- d. Timelines and agreements